期刊文献+

基于拉压杆模型的混凝土索塔锚固区环向预应力设计方法 被引量:5

Prestress Design for Concrete Pylon Anchorage Zone Based on the Strut-and-tie Models
下载PDF
导出
摘要 索塔锚固区是典型的D区(应力扰动区),目前国内外对该区域的预应力配筋设计尚无成熟方法。随着拉压杆模型研究的逐步发展,该理论可运用到索塔锚固区。在阐述拉压杆模型设计法一般步骤之后,以重庆轨道六号线二期蔡家嘉陵江大桥为应用实例,通过二次开发拓扑优化方法建立了索塔锚固区的拉压杆模型,依据该模型进行了锚固区预应力设计,并采用数值模型验证了该方法的有效性。 Pylon anchorage zone is a typical D-region. Due to the geometrical complexity and stress disturbance in this region, there are no well-established approaches available yet for prestress design. With the development of strut-and-tie models ( STM), this theory can be used for this design. General steps for the STM method were introduced in this paper. Based the project of Cai Jia JiaLing River bridge, the application of the STM through the topology optimization method for cable pylon anchorage zone was presented, then, prestress design based the STM are validated by numerical models.
出处 《结构工程师》 北大核心 2016年第1期5-9,共5页 Structural Engineers
关键词 拉压杆模型 D区 斜拉桥桥塔 锚固区预应力设计 拓扑优化 strut-and-tie model, D-region, cable stayed bridge pylon, prestress design, topology optimization
  • 相关文献

参考文献10

  • 1AASHTO. AASHTO LRFD Bridge design specifica- tions (third edition) [ S ]. The American Association of State Highway and Transportation Officials ,2004.
  • 2ACICommittee 318. Building code requirements for structural concrete and commentary ( ACI 318M-05 ) [ S ]. American Concrete Institute,2005.
  • 3陈建阳,徐国平,刘丽,朱正群.大吨位小半径环向预应力在斜拉桥索塔锚固区中的应用研究[J].桥梁建设,2001,31(2):12-15. 被引量:26
  • 4董冰,苏庆田.兰墅大桥索塔受力分析[J].结构工程师,2006,22(2):25-28. 被引量:7
  • 5刘钊,孟少平,刘智,吉林,欧庆保,王强.润扬大桥北汊斜拉桥索塔节段足尺模型试验研究[J].土木工程学报,2004,37(6):35-40. 被引量:42
  • 6李兴华,安群慧,王戒躁.芜湖长江大桥索塔锚固区模型试验研究[J].中国铁道科学,2001,22(5):103-106. 被引量:18
  • 7Schlaich J,Schafer K,Jennewein M. Toward a consist- ent design of structural concrete [ J ]. Journal of the Prestressed Concrete Institute, 1987,32 ( 3 ) :74-150.
  • 8Liang Q Q,Uy B, Steven G P. Performance-based op- timization for strut-tie modeling of structural concrete [J]. Journal of Structural Engineering, 2002, 128 (6) :815-823.
  • 9Leu L J,Huang C W, Chen C S, et al. Strut-and-tie design methodology for three-dimensional reinforced concrete structures [J].Journal of Structural Engineer- ing,2006,132 ( 6 ) :929-938.
  • 10Zhi Qihe,Zhao Liu. Optimal three-dimensional strut- and-tie models for anchorage diaphragms in externally prestressed bridges [ J ]. Engineering Strutures, 2010, 32 ( 18 ) : 2057-2064.

二级参考文献7

  • 1严国敏.现代斜拉桥[M].西安:西南交通大学出版社,1995..
  • 2江苏省长江公路大桥建设指挥部,东南大学华东预应力技术联合开发中心等.润扬长江公路大桥北汊斜拉桥索塔锚固区足尺模型试验研究报告,2002年8月,南京
  • 3东南大学预应力工程研究所研究报告:大曲率U形预应力束及真空辅助压浆技术在南京长江二桥索塔工程中的应用研究,1999年12月,南京
  • 4严国敏,现代斜拉桥,1995年
  • 5林元培,斜拉桥,1994年
  • 6SaeedMoaveni 欧阳宇译.有限元分析-ANSYS理论与应用[M].北京:电子工业出版社,2003..
  • 7JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范.[S].,..

共引文献77

同被引文献37

引证文献5

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部