深水急流裸岩钢栈桥施工技术研究 被引量:29

Construction Technology of Steel Trestle on Bare Rocks in Deep Water with a Large Flow Rate
下载PDF
导出
摘要 结合福平铁路乌龙江特大桥栈桥的施工,对在水深较深、水流速度较大、河床为裸岩等因素影响下的栈桥设计及施工方法进行研究。重点阐述了栈桥钢管桩基础加固形式及管桩河床面附近的锚固形式。通过RBCCE计算软件建立受力模型对栈桥管桩的受力情况进行了检算,并经过实际使用验证了栈桥的稳定性满足施工要求。 Combined with the trestle construction for Wulongjiang Extra-large Bridge of Fuping Railway,this paper discusses the design and construction method of trestle under the influences of deep water with a large flow rate,bare river bed and so on. The paper mainly expounds the reinforced form of trestle steel tube pile foundation and the anchorage form nearby the river bed surface. The stress of trestle steel tube pile is checked through establishing the loading model by the RBCCE calculation software. As a result,it is verified that the stability of the trestle meets the requirements of the construction after the practice.
作者 伊凯
出处 《铁道建筑技术》 2016年第2期17-21,共5页 Railway Construction Technology
基金 中国铁建股份有限公司2014年度科技研究开发计划课题(14-C25)
关键词 钢栈桥 钢管桩基础 锚固形式 加固结构检算 栈桥施工 steel trestle foundation of steel pipe pile anchorage form check of reinforced structure construction of trestle
  • 相关文献

参考文献12

二级参考文献19

共引文献460

同被引文献118

引证文献29

二级引证文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部