富水软土地层盾构隧道管片位移控制技术研究 被引量:9

Control Techniques for Segment Displacement of Shield Tunnel in Water-rich Soft Soil Layer
下载PDF
导出
摘要 以郑州地铁1号线1标凯旋路站~西三环路站盾构区间富水软土地层左线盾构机穿越西流湖为背景,针对盾构机穿越西流湖时出现管片破损、上浮等现象,对管片位移原因进行了分析,并研究了一系列控制措施和技术方案。研究表明,运用管片约束控制技术和盾构机姿态控制技术可解决管片上浮、破损等问题,并确保了盾构机顺利、快速、安全地通过西流湖,也为以后类似工程施工积累了宝贵经验。 Based on the left line shield machine crossing the Xiliu Lake in water-rich soft soil layer from Kaixuan Road Station to the West Three Ring Road Station of Zhengzhou Metro Line 1 Lot 1,and according to the troubles of the damaged segment and the segment floating of the shield crossing the Xiliu Lake,we analyzed the reason of segment displacement and studied a series of control measures and technical solutions. The practice proved that using the technologies of segment constraint control and shield machine attitude control could solve segment floating,damage and other problems,and ensured that the shield machine crossing the Xiliu Lake in a smooth,fast and secure manner. It could accumulate valuable experiences for similar projects in future.
作者 张贵平
出处 《铁道建筑技术》 2016年第2期66-68,共3页 Railway Construction Technology
基金 中铁十一局集团有限公司科研项目(ZT11KY2011-051)
关键词 富水软土 盾构隧道 管片位移 控制措施 water-rich soft soil shield tunnel segment displacement control measures
  • 相关文献

参考文献8

二级参考文献25

共引文献136

同被引文献56

引证文献9

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部