摘要 以沁河河道现状堤防为研究对象,通过对工程地质条件的分析,建立地质概化模型,采用地下水渗流程序Geo Studio-Seep/W建立二维有限元模型,分析截渗墙的深度和厚度对防渗性能的影响。研究结果表明:截渗墙明显降低了地下水的浸润面,增加了非饱和土的范围,同时减少了高水头的范围,对大堤和堤基土的稳定性有利;截渗墙对断面流量、出逸高度和出逸坡降都有明显的降低,而截渗墙厚度对以上因素的影响不大;全截式截渗墙的防渗效果最好,改变全截式截渗墙的深度,防渗效果没有改变,截渗墙厚度为20 cm、深入相对隔水层1~2 m时,可满足防渗要求。 Based on the study object of Qin river actuality embankment, the geological generalized model was established by engineering geological conditions analysis and two-dimensional finite element model was built through the Geo Studio-Seep / W of underground water seepage procedure. The anti-seepage performance effect factors of cut-off wall's thickness and depth were analyzed. The results showed that the cutoff wall reduced the seepage surface of underground water, increased the range of unsaturated soil while reduced the high head range which were favorable to embankment and its foundation soil. The seepage flow, exit height and exit hydraulic gradient were reduced significantly by cut-off wall. The full-cut type had best anti-seepage performance, but the thickness had less effect on these factors. When the depth of full-cut type changed, the anti-seepage performance was not changed, so it could meet the anti-seepage requirements when the cut-off wall had the thickness of 20 cm and cutting in the relative impermeable layer with the depth of 1-2 m. Research method can provide a reference to the design of embankment cutoff wall.
出处 《黄河水利职业技术学院学报》 2016年第1期1-5,共5页 Journal of Yellow River Conservancy Technical Institute
关键词 沁河 堤防 截渗墙 防渗性能 SEEP/W 有限元分析 Qin River embankment cut-off wall anti-seepage performance SEEP / W finite element analysis
  • 相关文献

参考文献14

二级参考文献28

  • 1刘文平,郑颖人,刘元雪.边坡稳定性理论及其局限性[J].后勤工程学院学报,2005,21(1):15-19. 被引量:14
  • 2罗守成.对深厚覆盖层地质问题的认识[J].水力发电,1995,22(4):21-24. 被引量:34
  • 3刘建华,郭忠印.基于非饱和土理论的公路排水设计方法[J].同济大学学报(自然科学版),2006,34(2):191-195. 被引量:18
  • 4马国彦.治理开发黄河中的环境地质.第30届国际地质大会水利系统论文集[M].郑州:黄河水利出版社,1996..
  • 5吴伟功 刘丰收 等.黄河下游堤坊截渗墙工程项目建议书阶段工程地质勘察报告[M].,1999..
  • 6Paola Ariza, Bjorn Birgisson. Evaluation of Water Flow Through Pavement Systems[R]. MN/RC - 2002-30. Minnesota: Minnesota Department of Transportation, 2002.
  • 7SEEP/W Users Manual, Version 4.24. GEO-SLOPE International Ltd. Calgary, 2001.
  • 8顾慰慈.渗流计算原理及应甩[M].北京:中国建材出版社,1986.
  • 9SL265-2001.水闸设计规范[S].[S].,..
  • 10毛昶熙 段祥宝 李祖贻.渗流数值计算与应用[M].南京:河海大学出版社,1981..

共引文献89

同被引文献19

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部