华安水电厂一号机组技术改造的探索与实践 被引量:2

Exploration and Practice of Technical Transformation of No.1 Generating-unit in Huaan Hydropower Station
下载PDF
导出
摘要 通过对华安水电厂一号机组进行增容改造,解决了过流部件磨损、主轴密封不可靠漏水、主轴中心补气口漏水等问题。结合华安水电厂一号机组技术改造中出现的问题及相应的解决措施,系统阐述水电机组改造的关键技术与注意事项,为今后相关工程项目提供借鉴和参考。 Through the capacity expansion of No.1 generating-unit in Huaan hydropower plant, the flow passage wear, the unreliable leakage of main-shaft sealing, the leakage of main-spindle center air admission inlet and other prob- lems were solved. Combination appeared problems when No. 1 generating-unit of Huaan Hydropower Station was technically transformed and corresponding solutions, key technologies and matters needing attention of hydropower generator units transformation were formulated, which will provide the reference for the future related projects.
出处 《发电与空调》 2016年第1期11-15,29,共6页
关键词 技术改造 主轴密封 主轴中心补气 调速器 technical transformation main-shaft seal main-spindle center air admission speed governor
  • 相关文献

参考文献4

二级参考文献4

  • 1机电工程手册编辑委员会.机械工程手册:第5卷[M].北京:机械工业出版社,1982.
  • 2刘后桂.密封技术[M].湖南:湖南科学技术出版社,1983.
  • 3[日]吉田亨 主编,刘知飞,吴广仁.现场焊接技术[M]河北人民出版社,1982.
  • 4刘建红,徐鸣鹤,王睿.水轮发电机组主轴密封中端面密封的设计[J].润滑与密封,2011,36(6):101-103. 被引量:4

共引文献68

同被引文献26

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部