某300MW机组高压给水管道热位移异常原因分析及处理 被引量:7

Analysis and Treatment about Thermal Displacement Anomaly of High Pressure Water Supply Pipeline for a 300MW Unit
下载PDF
导出
摘要 对某300MW机组高压给水管道支吊架的冷、热态检查发现其部分管段竖直向热膨胀位移为零,经过管道应力计算确定了管道热膨胀受阻对管系安全的巨大危害,通过设计资料查询核对及吊架选型计算,确定了位移异常的原因为两组恒力吊架选型过大,最终通过更换合适的恒力吊架,使得管道热膨胀位移正常,有效的保证了机组的安全运行。 For 300 MW unit high pressure feed water pipe support and hanger cold and hot state examination revealed some of its tube vertical section to thermal expansion displacement is zero, through a pipeline stress calculation to determine the pipeline thermal expansion blocked the huge harm on the tube, through the design of data query check and a hanger type selection calculation to determine the abnormal displacement due to two groups of constant force hanger selection is too large, ultimately through constant force hanger for a suitable replacement, the pipeline thermal expansion displacement of normal, effectively guarantee the safe operation of the unit.
作者 刘明 张毓琳
出处 《发电与空调》 2016年第1期55-57,共3页
关键词 高压给水管道 支吊架 选型 热位移 High pressure water supply pipeline Supports Lectotype Thermal displacement
  • 相关文献

参考文献3

  • 1DL/T5366-2014,火力发电厂汽水管道应力计算技术规程[S].北京:中国电力出版社,2014.
  • 2水利电力部西北电力设计院.火力发电厂汽水管道支吊架手册[M].西安,1983.
  • 3卫大为,安付立,康豫军.某火电厂1000MW机组高温再热蒸汽管道热位移异常原因分析[C].成都:第九届电站金属材料学术年会.2011:548~552.

共引文献1

同被引文献41

引证文献7

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部