期刊文献+

一种地下导线测量新方法的探讨 被引量:4

Discussion on a new method of underground traverse survey
下载PDF
导出
摘要 为提高全站仪井下导线测量的精度和效率,通过在全站仪手柄上安装一个偏心测量装置,在采集数据时全站仪不用精确对中测量点,首先读取垂球在偏心测量盘上的读数,之后进行常规的全站仪导线测量操作,最后利用计算机编程开发软件将所得数据进行归化改正。该方法测量精度高、效率高,成本低,操作简便,数据处理自动化程度高,数据处理结果能够直观显示并保存,在保证精度的前提下提高了井下导线测量的效率,改进了全站仪井下导线测量的流程。 To improve the accuracy and efficiency of underground traverse survey, an eccentric measuring device is mounted on the handle of total station which saves precise centering to measurement points. Firstly, read the plumb readings on the eccentric survey plate, followed by conventional total station traverse operation, and finally use the computer's software programming development to correct the resulting data. This method is of high accuracy and efficiency,low cost,simple operation,and is highly automated in data processing,the data results can be visually displayed and saved. Under the premise of ensuring the accuracy,the efficiency of underground traverse survey is improved,the process of underground traverse survey with total station is also improved.
出处 《煤炭工程》 北大核心 2016年第3期55-57,共3页 Coal Engineering
基金 国家自然科学基金资助项目(41272388)
关键词 全站仪 井下导线测量 偏心测量盘 归化改正 total station underground traverse survey eccentricity survey plate domestication correction
  • 相关文献

参考文献11

二级参考文献31

  • 1魏忠邦,翟翊.光电测距水平距离的计算[J].测绘通报,2005(9):61-62. 被引量:11
  • 2索效荣,韩立富,李国林.四架法在矿井延伸测量中的实践与应用[J].矿山测量,2006,34(3):73-74. 被引量:6
  • 3[1]Vanicek P,Krakiwsky E (1982) Geodesy-the concepts.Amsterdam:North Holland Publishing Co..392-393
  • 4[2]Xiong J,Yang Y X (1988) On the transformation and deformation of three-demensional geodetic network.Acta Geodetica et Cartographica Sinica,17(1):1-8(in Chinese)
  • 5[3]Yang Y X (1999) Robust estimation of geodetic datum transformation.Journal of Geodesy,73: 268-274
  • 6[4]Zhu H,Lu Z (1985) The polynomial approximating method for combining the space geodetic network and terrestrial geodetic network,Journal of Surveying and Mapping (JSM),31(in Chinese)
  • 7[5]Zhu H,Yang Y,Lu Z (1994) GPS coordinate system transformation.Beijing:Publishing House of Surveying and Mapping.(in Chinese)
  • 8[6]Abd-Elmotaal H (1994) Comparison of polynomial and similarity transformation based datum-shifts for Egypt.Bulletin Geodesique,68:168-172
  • 9[7]Abou-Beih O M,Al-Garni A M (1996) Precise geodetic positioning based on the concept of variable datum transformation parameters.The Australian Surveyor,214-220
  • 10[8]Huang W S (1992) On the theories and applications of the modern adjustment.Beijing:Press of Liberation Army,441-442(in Chinese)

共引文献143

同被引文献19

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部