地铁超深中间风井关键技术设计和研究 被引量:19

Design and Analysis of key technologies for Metro Super-depth Intermediate Ventilation Shaft
下载PDF
导出
摘要 为解决地铁超深中间风井的设计和施工高风险问题,结合武汉地铁4号线越江区间超深中间风井,通过对超深中间风井设计方案的比选,分析超深中间风井设计和施工中的重难点,得出超深中间风井围护、止水降水方案、盾构穿越中间风井等关键技术的详细方案,成功解决超深风井的高风险问题。 To solve the high risks in the design and construction of metro intermediate ventilation shaft, this paper analyzes the difficulties encountered in the design and construction of super-depth intermediate ventilation shaft with reference to the practices in the super-depth intermediate ventilation shaft of the river-crossing on Wuhan Metro line 4 and based on comparison of design schemes. The results show that the key technologies such as retaining structure, sealing and dewatering solutions and shielding process are proved successful to solve the high risks in the construction.
作者 彭长胜
出处 《铁道标准设计》 北大核心 2016年第4期91-95,共5页 Railway Standard Design
关键词 地铁 越江隧道 中间风井 设计 Metro River-crossing tunnel Intermediate ventilation shaft Design
  • 相关文献

参考文献11

二级参考文献42

共引文献64

同被引文献148

引证文献19

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部