以龙背湾水电站为例,介绍了大坝主堆石料的运输要求,提出了运输干道布置的设计方案,从方案的特性及工程投资等方面进行了比选,确定了最优方案。特别介绍了采用交通洞方案的优点及应用效果。
The transportation requirement for main rockfill materials in Longbeiwan Hydropower Station is introduced.Then,several designs of the main transportation scheme are presented and compared from the engineering and investment prospects. Specifically,the transportation tunnel scheme is introduced,including its advantages and actual performance.
出处
《水电与新能源》
2016年第3期30-33,共4页
Hydropower and New Energy
关键词
填筑强度
运输强度
运输干道
交通洞
filling intensity
transportation intensity
main transportation road
transportation tunnel