摘要
超高层施工中会遇到裙房与塔楼交界处型钢转换梁跨越沉降后浇带、同时型钢梁上有型钢转换柱的情况,结合工程实例,详细阐述型钢转换梁跨沉降后浇带的施工方法,在保证结构沉降需要的同时,确保了施工安全质量和进度。
Because of the late poured band at the podium and tower intersection or the condition of steel reinforced transfer beam crossing steel reinforced transfer columns,combining with the project examples,the construction method of steel reinforced transfer beam crossing the late poured band is described in detail. The structure settlement requirement is guaranteed,meanwhile the construction safe quality and program is ensured.
出处
《施工技术》
CAS
北大核心
2016年第6期83-86,共4页
Construction Technology
关键词
梁
型钢转换梁
后浇带
施工技术
beams
steel reinforced transfer beam
late poured band
construction