2Khan M F. A critical review of well control procedures for the prevention of blowout ( loss of kick) [ D ]. Cana- dai Dalhousie University, 2010.
3Harlow W F, Brantley B C, Harlow R M. BP initial im- age repair strategies after the Deepwater Horizon spill [J]. Public Relat. ,2011, Rev. 37, 80-83.
4Cai B P, Liu Y H, Liu, Z K, et al. Performance evalu- ation of subsea blowout preventer systems with common- cause failures [ J ]. Journal of Petroleum Science and En- gineering, 2012(90/91 ) : 18 - 25.
5Sun Z G. Research on parametric design and simulation technology for the blowout preventer[ D ]. Beijing: China University of Petroleum, 2009.