4Chainarong Athisakul,Thongchai Phanyasahachart.Static equilibrium configurations and appropriate applied top tension of extensible marine riser with specified total arclength using finite element method[J].Engineering Structures,2012,34(1):271-277.
5Wendler C,Maia C T.Planning and conducting well tests in deep and ultra-deep water to mitigate potential risks and justify expense for the operator[C].SPE 143810,2011.
6Salguero A,Almanza E,Nivens H.Well-test planing for deepwater wells in high-pressure,high-temperature environments-The Brazil experience[C].SPE 112959,2008.
7Stomp R J,Fraser G J.Deepwater DST planning and operations from a DP vessel[C].SPE 90557,2009.
8Etcheverry C F,Claudio R.F.Tigre Maia.Innovative adaptation of subsea test tree successfully tests ultra deep water wells in the Campos Basin[C].SPE 53945,1999.
9Mogbo O.Deepwater DST design,planning and operations-offshore niger delta experience[C].SPE133772,2010.
10Pontes T.Case study:Downhole testing tools for forma-tion evaluation in high-pressure and high-temperature environments[C].SPE 128965,2010.