摘要 以某4×1 036MW机组的氢气供应系统为例,介绍了氢气供应系统的组成及设备状况。当储氢罐需检修时,应进行检修前和检修后的置换操作。在置换操作过程中,易产生各种影响设备安全的危险因素。为此,提出了相应的预防措施和对策。通过分析,为防止危险的发生,提出了有益的建议,并在储氢罐的置换操作中得到实施,确保了机组的稳定运行。 Taking the hydrogen supply system in certain 4 ×1036 MW units as an example, this paper introduces the equipment of the hydrogen supply system and equipment conditions. Replacement operation shall be conducted before and after the hydrogen storage overhaul. Risk factors that affect the safety of the equipment occur during the replacement operation process. The corresponding prevention strategies and approaches are presented. Useful suggestions have been put forward to prevent accidents through analysis, and have been carried out in the replacement process of hydrogen storage tank, which ensured the stable operation of the unit.
机构地区 华能海门电厂
出处 《电站辅机》 2016年第1期49-52,共4页 Power Station Auxiliary Equipment
关键词 氢气 供应 储氢罐 氮气 置换 操作 危险因素 分析 hydrogen gas supply hydrogen storage tank nitrogen replacement operation risk factor analysis
  • 相关文献

参考文献2

二级参考文献7

  • 1王飞跃,徐志胜.300m^3易燃易爆湿式氢气贮柜爆炸事故分析[J].工业安全与环保,2004,30(10):14-17. 被引量:2
  • 2..国电[2000]589号.防止电力生产重大事故的二十五项重点要求[S]..,,....
  • 3《新编危险化学品安全手册》编委会.新编危险化学品安全手册[M].北京:化学工业出版社,2001.
  • 4Dorofeev S B. Evaluation of safety distances related to unconfined hydrogen explosions [J]. Internalional Journal of Hydrogen Energy,2007,(32):2118-2124.
  • 5崔克清.燃烧爆炸理论与技术[M].北京:中国计量出版社,2005.
  • 6Toshio Mogi, Dongjoon Kim, Hiroumi Shiina, et al. Self-ignition and explosion during diseharge of high pressure hydrogen [ J ]. Journal of Loss Prevention in the Process Industries, 2008, (21): 199-204.
  • 7国家安全生产监督管理局.安全评价(修订版)[M].北京:煤炭工业出版社,2004.

共引文献14

同被引文献16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部