期刊文献+

宝成铁路某段山体裂缝调查分析及防治对策 被引量:1

Mountain Tension Fissure Investigations and Mitigations for Station K313+950 and K314+300,Baocheng Railway
原文传递
导出
摘要 宝成铁路下行线K313+950~K314+300段北侧山体地质情况复杂,裂缝规模大,已严重威胁宝成铁路车辆的运营安全,对其进行治理已迫在眉睫。基于裂缝调查提出分区评价山体的稳定性,通过重点断面的稳定性计算,综合评价山体稳定性情况。在此基础上提出桩、锚索、防护网及裂缝充填的治理方案,为今后类似地质灾害的处治提供了工程借鉴。 Baocheng railway K313+950-K314+300 downlink line on the north side of the mountain consists of complex geological conditions and the safe operation of the Baoji Chengdu Railway Vehicle is threaten due to large scale cracks.Based on the investigation of the crack,the stability evaluations were performed for the entire mountain and different sections of the mountain.A comprehensive mitigation plan was developed including piles,ground anchors,protection nets,and crack filling.This paper provides a reference for future similar engineering geological disaster treatment.
出处 《土工基础》 2016年第1期20-23,共4页 Soil Engineering and Foundation
关键词 山体裂缝 地质灾害 分区评价 治理方案 Mountain Tension Fissures Geological Hazards Zoned Evaluations Mitigation Measures
  • 相关文献

参考文献6

二级参考文献23

共引文献624

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部