期刊文献+

连云港海域围垦工程对水沙环境的影响 被引量:4

Influence of reclamation project on hydrodynamic and sediment environment of Lianyungang sea area
下载PDF
导出
摘要 基于嵌套的平面二维潮流泥沙数学模型,模拟了海州湾海域滨海示范区围垦工程实施前后的潮流场、悬沙分布,并采用实测资料对模型进行验证,分析围垦工程后计算海域潮流场、悬沙场及海床冲淤场的水沙环境的变化情况。结果表明:围垦后研究海域整体的潮流场和悬沙场变化较小,但围垦后附近海域纳潮量有所减小引起围区附近流速减小,围垦工程附近基本呈现淤积的状态,工程左侧吹填坑淤积强度较大,临洪河口则出现局部冲刷。 Based on two dimensional nested gird tidal current and sediment numerical model,we simulate the tidal current field and distribution of suspended sediment in reclamation of Haizhou bay. The simulation fits well with the measured data. Analyzing the impact of the current field on the surrounding sea and the annual change in erosion and deposition after the project,we know that the whole calculated area tidal current and suspended filed change little. But decrease of the current velocity near the project causes reduction of the tidal prism. The deposition is presented near the project sea. The siltation intensity of the filling pit at the left is larger,and erosion is presented in part of Linghong river estuary.
出处 《水运工程》 北大核心 2016年第3期29-34,56,共7页 Port & Waterway Engineering
基金 国家海洋局海洋公益性行业科研专项项目(201205005) 国家自然科学基金项目(41276017) 江苏省普通高校研究生科研创新计划项目(KYZZ15_0143)
关键词 水沙环境 围垦工程 潮流泥沙 海州湾 hydrodynamic sediment environment reclamation project current and sediment Haizhou bay
  • 相关文献

参考文献10

二级参考文献77

共引文献173

同被引文献68

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部