摘要
文章结合福清核电项目建安竣工文件管理的创新实践,阐述了业主与工程公司成立"联合文档中心"进行文档管理的模式,提出了福清核电项目建安竣工文件管理的全程控制思路,保证了竣工文件的完整性、准确性和系统性,实现了建安竣工文件与项目实体同步移交。
The paper, combining with innovative practice in construction and installation acceptance document management of Fuqing nuclear power project, describes a document management model of joint documentation centre constructed by the owner and the engineering company, presents a whole process control ideas in construction and installation acceptance document management of Fuqing nuclear power project, ensures the completeness, accuracy and systematicness of the document, and achieves synchronous delivery of the acceptance document and project itself.
出处
《中国核电》
2016年第1期57-61,共5页
China Nuclear Power
关键词
核电项目
竣工文件
文件管理
同步移交
nuclear power project
acceptance document
document management
synchronous delivery