摘要
在铁路工程施工过程中,时常会发生工程合同变更索赔的问题。在变更索赔中,不仅要做到及时、有利、有据,而且还需要掌握一些索赔技巧,从而顺利实现工程索赔。论文结合某铁路工程实例,针对该项目原合同中的工程量、工程单价以及工期都已不能满足实际需要,如不及时进行变更确认,将给我方带来致命的合同风险,基于此提出合同变更索赔,并总结出可行的索赔成功经验。
In the process of railway construction, often contract engineering changes and claims, so in the changes and claims in, not only to timely, beneficial, have according to, but also need to master some skills of claims, in order to achieve a smooth project claim.Through combining with the example of a railway project, for engineering quantity of the project in the original contract, project cost and schedule have been unable to meet the actual needs, if not timely confirm the change, I will bring fatal contract risk, based on this proposed change to the contract claims, the total node a viable claim success experience.
出处
《工程建设与设计》
2016年第4期171-172,181,共3页
Construction & Design for Engineering
关键词
铁路工程
合同变更
工程索赔
railway engineering
contract change
engineering claims