摘要
提出了氧化铝生产赤泥堆场的环境影响评价构架及生产阶段尽量减少下渗量的措施 。
The author describes the skeleton of environmental impact assessment for the alumina red mud disposal and puts forward the measures of decreasing penetration volume during production period,thus will protect the underground water environment effectively.
出处
《工业安全与环保》
2002年第8期37-38,共2页
Industrial Safety and Environmental Protection