天然气站场工艺管道吹扫试压方法 被引量:4

Process Piping Blowing and Pressure Test Method in Natural Gas Station
下载PDF
导出
摘要 以唐山LNG外输管道工程丰南分输站工艺管道的吹扫试压方法取得的效果为依据,总结了在天然气站场工艺管道吹扫试压方法选取中需考虑的因素。从吹扫介质选取、吹扫段落的划分、吹扫注意事项等方面对吹扫方法进行了分析;从试压方法选取、试压段落的划分、试压注意事项等方面对试压方法进行了分析。最后结合国内天然气站场的实际情况,对天然气站场工艺管道吹扫试压方法的制定提出了建议。 The result of the method which took the bowing and pressure test in the Fengnan gas station of Tangshan LNG pipeline was as the basis,the factors should be considered in the bowing and pressure test method in natural gas station. The bowing method from the aspects of purge media,the divisions of purge section,purge notes and so on was analyzed. The pressure test method from the aspects of pressure test method,the divisions of pressure test section,pressure test notes and so on was analyzed. Finally,according to the actual situation of the domestic natural gas station,some advices for the process piping blowing and pressure test of natural gas station were put forward.
出处 《管道技术与设备》 CAS 2016年第1期55-57,共3页 Pipeline Technique and Equipment
关键词 天然气站场 工艺管道 吹扫试压 介质 压力 natural gas station process piping blowing and pressure test media pressure
  • 相关文献

参考文献2

二级参考文献8

  • 1GB50251-2003.输气管道工程设计规范[S].[S].,..
  • 2GB50540-2009石油天然气站内工艺管道工程施工规范[S].
  • 3ASMEB31.8-2012,气体输送和分配管道系统[S].
  • 4MohinderLNayyar.管道手册[M].北京:中国石化出版社.2006.828-853.
  • 5闫锋,闫红霞,谷英翠,等.长输管道严密性试压稳压时间研究[J].石油工程建设,2011,(6):1-6.
  • 6闫锋,张宏,张永学,段庆全.输气管道严密性水试压稳压时间研究[J].压力容器,2007,24(10):6-8. 被引量:2
  • 7中华人民共和国国家标准.石油天然气站内工艺管道工程施工规范[J] .2009.
  • 8梁翕章.浅谈输气管道试压问题(续前)[J].天然气与石油,2003,21(4):1-6. 被引量:22

共引文献4

同被引文献11

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部