Process optimization of billet continuous caster and practice verification

Process optimization of billet continuous caster and practice verification
下载PDF
导出
摘要 This study analyzes the factors of influence on 0~# continuous caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation(hereinafter referred to as Basteel).Diameter of tundish upper nozzle is small,and the molten steel leakage accidents have been greatly manifolded in the high casting speed.In order to increase yield of 0~# continuouse caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation,and a series of amelioration measure was put forward.Through enlarging diameter of tundish upper nozzle(fromφ21 mm toφ21.5 mm ),after the water distribution of the secondary cooling was optimized.Based on stabilizing the quality,improving the average casting speed and work rate of the caster,the capacity of the billet continuous caster was improved.A better results was gained;the average casting speed had been increased from 3.04 m/min to 3.21 m/min.Production of the caster had been improved from 1 005 179.926 t in 2008 to 1 040 853.075 t in 2009.Quality of the concasting billets and production had also been stabilized. This study analyzes the factors of influence on 0~# continuous caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation(hereinafter referred to as Basteel).Diameter of tundish upper nozzle is small,and the molten steel leakage accidents have been greatly manifolded in the high casting speed.In order to increase yield of 0~# continuouse caster in No.1 Steelmaking Plant of Xinjiang Bayi Iron & Steel Corporation,and a series of amelioration measure was put forward.Through enlarging diameter of tundish upper nozzle(fromφ21 mm toφ21.5 mm ),after the water distribution of the secondary cooling was optimized.Based on stabilizing the quality,improving the average casting speed and work rate of the caster,the capacity of the billet continuous caster was improved.A better results was gained;the average casting speed had been increased from 3.04 m/min to 3.21 m/min.Production of the caster had been improved from 1 005 179.926 t in 2008 to 1 040 853.075 t in 2009.Quality of the concasting billets and production had also been stabilized.
出处 《Baosteel Technical Research》 CAS 2010年第S1期26-,共1页 宝钢技术研究(英文版)
关键词 casting speed operation rate secondary cooling scheme tundish upper nozzle casting speed operation rate secondary cooling scheme tundish upper nozzle
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部