期刊文献+

Beam transport experiment with a new kicker control system on the HIRFL

Beam transport experiment with a new kicker control system on the HIRFL
原文传递
导出
摘要 A kicker control system is used for beam extraction and injection between two cooling storage rings(CSRs) at the Heavy Ion Research Facility in Lanzhou(HIRFL). To meet the requirements of special physics experiments, the kicker controller has been upgraded, with a new controller designed based on ARM+DSP+FPGA technology and monolithic circuit architecture, which can achieve a precision time delay of 2.5 ns. In September2014, the new kicker control system was installed in the kicker field, and the test experiment using the system was completed. In addition, a pre-trigger signal was provided by the controller, which was designed to synchronize the beam diagnostic system and physics experiments. Experimental results indicate that the phenomena of “missed kick”and “inefficient kick” were not observed, and the multichannel trigger signal delay could be adjusted individually for kick power supplies in digitization; thus, the beam transport efficiency was improved compared with that of the original system. The fast extraction and injection experiment was successfully completed based on the new kicker control systems for HIRFL. A kicker control system is used for beam extraction and injection between two cooling storage rings(CSRs) at the Heavy Ion Research Facility in Lanzhou(HIRFL). To meet the requirements of special physics experiments, the kicker controller has been upgraded, with a new controller designed based on ARM+DSP+FPGA technology and monolithic circuit architecture, which can achieve a precision time delay of 2.5 ns. In September2014, the new kicker control system was installed in the kicker field, and the test experiment using the system was completed. In addition, a pre-trigger signal was provided by the controller, which was designed to synchronize the beam diagnostic system and physics experiments. Experimental results indicate that the phenomena of “missed kick”and “inefficient kick” were not observed, and the multichannel trigger signal delay could be adjusted individually for kick power supplies in digitization; thus, the beam transport efficiency was improved compared with that of the original system. The fast extraction and injection experiment was successfully completed based on the new kicker control systems for HIRFL.
出处 《Chinese Physics C》 SCIE CAS CSCD 2016年第4期113-117,共5页 中国物理C(英文版)
基金 Supported by National Natural Science Foundation of China(U1232123)
关键词 completed installed Lanzhou supplies inefficient missed trigger monolithic diagnostic adjusted completed installed Lanzhou supplies inefficient missed trigger monolithic diagnostic adjusted
  • 相关文献

参考文献6

  • 1Y. Y. Wang, Y. H. Guo, F. Y. Lin et al, High Power Laser and Particle Beams, 20 (8): 1353-1356 (2008) (in Chinese).
  • 2L. L. Di, M. Gu, Q. B. Yuan, and X. R. Fan, Nuclear Techniques, 3,5 (1):12-16 (2012).
  • 3Q. B. Yuan, M. Gu, R. P. Wang et al, Nuclear Science and Techniques, 18 (6):326-329 (2007).
  • 4P. Xue, J. J. Zhao, and J. H. Chen, Nuclear Electronics & Detection Technology, 26 (5):638-641 (2006).
  • 5Y. Y. Wang, W. X. Zhou, J. F. Luo, D. T. Zhou et al, Nuclear Instruments and Methods in Physics Research A, 738:50-53 (2014).
  • 6J. W. Xia, W. L. Zhan, B. W. Wei, Y. J. Yuan et al, High Power Laser and Particle Beans, 20 (11): 1787-1794 (2008) (in Chinese).

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部