摘要
云桂铁路上村隧道出口工区的浅埋、顺层偏压段施工过程中,由于处置不当,发生了沉降超限的事故。本文将事故发生的情况、发生的原因、处理方法以及其后面紧接着的顺层偏压段正确施工方法加以介绍。
In the process of shallow buried construction of unevenly-pressured section embedded in layered rock mass in the exit of Shangcun Tunnel in Yungui Railway(from Nanning to Kunming), an accident of over-loading and subsidence happened due to an improper handling. This paper introduces the process, reasons, countermeasures of this accident, and a correct construction method for the unevenly-pressured section embedded in layered rock mass.
出处
《石家庄铁路职业技术学院学报》
2016年第1期20-24,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
隧道施工
顺层偏压段施工
沉降控制
tunnel construction
construction of unevenly-pressured section embedded in layered rock mass
control of subsidence