期刊文献+

建设工程施工合同柔性的内涵及其影响因素——基于扎根理论 被引量:3

Research on the Connotation and Influencing Factors of Construction Contract Flexibility:Based on the Grounded Theory
下载PDF
导出
摘要 工程项目实践中的施工合同柔性以及影响因素尚未得到广泛关注。应用扎根理论探索工程合同柔性的构成以及影响因素的分类,构建各影响因素与合同条款柔性和合同执行柔性之间的概念模型,并对合同柔性内涵和影响合同柔性机理进行再分析。研究成果以期在实践中为提升建设项目绩效提供理论依据。 Construction contract flexibility and influencing factors have not been widely concerned. Based on the grounded theory, explores the composition of construction contract flexible and the classification of influencing factors, constructs the conceptual model about influencing factors between contract terms flexibility and contract execution flexibility, and reanalyzes the connotation of contract flexibility and influencing factors of contracts flexibility. The results contribute to theory of contract flexibility for promoting project performance.
作者 娄黎星
出处 《建筑经济》 2016年第4期90-94,共5页 Construction Economy
关键词 建筑业 建设工程 施工合同柔性 影响因素 扎根理论 construction industry construction project construction contract flexibility influencing factors grounded theory
  • 相关文献

参考文献2

二级参考文献41

  • 1周定山,孟宪海.工程合同文件缺陷索赔及案例[J].建筑经济,2003,24(3):41-44. 被引量:5
  • 2刘茂松,陈柏福.论柔性契约与垄断结构企业模式[J].中国工业经济,2006(5):79-86. 被引量:10
  • 3W. Wang, K Hawwash, J Perry. Contract type selector (CTS): a KBS for training young engineers[J]. International Journal of Project Management, 1996( 14):95-102.
  • 4S. Floricel, R. Miller.Strategizing for anticipated risks and turbulence in large scale engineering projects [J]. International Journal of Project Management, 2001 (19):445-455.
  • 5P.A. Thompson, J.G.Perry. Contract strategy in the 1990s [A].Proceedings of the 9th World Congress on Project Management Glasgow, 1988(9): 54-62.
  • 6J.R. Turner, S.J. Simister. Project contract management and a theory of organization[J]. International Journal of Project Management, 2001 (8): 457-464.
  • 7J. Hinze, J. Tada. General provisions critical to construction contracts [J]. Power Engineering, 1993 (2) :38.
  • 8A.A. Bubshait, S.A. Almohawis. Evaluating the general conditions of a construction contract[J]. International Journal of Project Management, 1994( 12):133-136.
  • 9Genus. Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel [J]. Research Policy, 1997 (26): 169-189.
  • 10P. Bajari, S. Tadelis. Incentives versus transaction costs: a theory of procurement contracts [J]. Rand Journal of Economics, 2001 (3) :387-407.

共引文献19

同被引文献11

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部