期刊文献+

大型桥梁冲刷防护工程损坏特性研究 被引量:5

Study on failure characteristics of scour protection engineering of large bridges
下载PDF
导出
摘要 以苏通大桥为例.通过模型试验和冲刷防护工程及周边河床地形的长期监测开展了大型桥梁冲刷防护工程的损坏特性研究。研究结果表明,大型桥梁冲刷防护工程存在两种损坏形式:防护工程防护区面层冲刷损坏和防护工程护坦边坡坍塌损坏;防护工程的破坏主要发生在防护工程后1—2年内。提出了以“损坏率”和“稳定边坡”分别表示两种不同类型的破坏指标。同时,提出了防护工程“成型稳定工程量基准线”概念,为监测冲刷防护工程稳定性制定定量目标。研究结果还表明,在防护体稳定后,防护区呈“洪季淤积、枯季冲刷”特点,这一变化对防护体稳定影响有限。研究结果为类似工程设计、监测、维护和相关研究提供参考。 Taking Sutong Bridge as an example, long-term monitoring on scour protection engineering and riverbed terrain and model test are applied to study the failure mechanism of scour protection engineering. The resuhs show that there are two forms of failure in scour protection for large bridges in tidal reach, which are erosion on surface and collapse of slope of aprons ; and they usually occur in 1 to 2 years after engineering acceptance. Damage rate and steady slope are suggested for failure index for two forms of failure respectively. Meanwhile, shaping security reference line is proposed based on results of long-term monitoring. When the size of protection engineering is less than the shaping security reference line, failure would take place. Moreover, the results also show that changes of protection zone are caused by sediment erosion or siltation on surface after engineering adapted with surrounding current and terrain; and these changes have no significant effect on stability of protection engineering. The research results can provide references for bridge design and related studies.
出处 《海洋工程》 CSCD 北大核心 2016年第2期24-34,共11页 The Ocean Engineering
关键词 冲刷防护工程 损坏形式 长期监测 模型试验 损坏率 面层冲刷 边坡坍塌 scour protection engineering damage in the form long-term monitoring model experiment breakage rate surface scour slope collapse
  • 相关文献

参考文献22

  • 1戴荣尧,卢金利,王群.桥墩冲刷防护计算[J].泥沙研究,1982(1):5l-56.
  • 2CHIEW Y M. Scour prection at bridge piers [ J ]. Journal of Hydraulic Engineering, 1992, 18 (9) : 1260-1269.
  • 3杨程生,高正荣.苏通大桥主塔墩基础冲刷防护工程稳定性分析[J].水利水运工程学报,2007(3):33-37. 被引量:5
  • 4高正荣,黄建维,卢中一.苏通大桥主塔墩冲刷防护工程关键技术[J].水利水运工程学报,2005(2):18-22. 被引量:16
  • 5卢中一,高正荣,黄建维.苏通大桥大型桩承台桥墩基础的局部冲刷防护试验研究[J].中国港湾建设,2009,29(1):3-8. 被引量:8
  • 6BONAUSOUNDAS M. Stromungvorgang undKolkproblem [ R]. Munich: Technical Univ. of Munich, 1973.
  • 7RICHARDSON K J, DAVIS S R. Evaluating scour at brigdes [ R]. Washington D. C. : Federal Hwy. Administration, 1993.
  • 8LAURSEN E M, TOCH A. Scour around bridge piers and abutments [ R]. Iowa City, Iowa: Iowa Highway Research Boad, 1956.
  • 9LIM F H. Riprap protection and failure mechanics at bridge piers pier[ D ]. Singapore: Nanyang Technological University, 1998.
  • 10FOTHERBY L M, JONES J S. The influence of sedfootings on pier scour depths [ C ]//Proceedings of the Hydraulic Engineering Conf.. Reston: ASCE.1993: 922-927.

二级参考文献79

共引文献90

同被引文献55

引证文献5

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部