期刊文献+

盾构穿越上软下硬地层施工技术措施 被引量:4

Metro Shield Tunneling Techniques for Upper Soft and Down Hard Formation
下载PDF
导出
摘要 文章围绕典型的上软下硬的地质环境,对盾构穿越上软下硬地层时的施工问题和风险进行了分析,并针对穿越上软下硬这种不良地层盾构施工发生的常见问题,研究了相应的解决措施和技术对策,以提高上软下硬地质环境下的盾构施工质量和地表建筑物安全。 The paper focuses on the typical upper soft and down hard geological conditions, analyzes the problems and risks in shield tunneling in upper soft and down hard strata. Aiming at the common problems in passing the upper soft and down hard unfavorable stratum in shield tunneling, the paper also studies the corresponding solutions and technical counter-measures, in order to improve the tunneling engineering quality and surface buildings safety of shield tunneling for upper soft and down hard geological environment.
作者 冯立君
出处 《现代城市轨道交通》 2016年第2期71-73,共3页 Modern Urban Transit
关键词 盾构施工 穿越上软下硬地层 施工控制技术 shield tunneling passing upper soft and down hard strata tunneling control technology
  • 相关文献

参考文献6

二级参考文献25

共引文献129

同被引文献23

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部