摘要 文中所述弧形工作闸门孔口尺寸为宽3.8 m,高4m,检修闸门和工作弧门之间通过4.38 m压坡段衔接,采用C25钢筋混凝土结构。文章对山西省小浪底引黄工程连通洞进水塔弧门牛腿梁进行的结构配筋计算分析,从水工结构的角度设计弧门牛腿梁,使其满足工程结构安全设计要求。 The hole dimension of arc working gate described in the paper is 3.8 meters high and 4 meters wide, maintenance gate and arc working gate are connected through a 4.38 meters long pressure section with reinforce concrete structure of C25 adopted. The arc bracket beam structure reinforcement of connecting tunnel intake tower, the Shanxi provincial Xiaolangdi Huanghe River diversion project, is calculated and analyzed to design the arc bracket beam based on hydrological structure for meeting the design demands on the safety of project structure safety.
作者 樊亚婷
出处 《黑龙江水利科技》 2015年第9期11-15,共5页 Heilongjiang Hydraulic Science and Technology
关键词 小浪底引黄工程 连通洞进水塔 弧形闸门 牛腿梁 钢筋混凝土 配筋计算 Xiaolangdi Huanghe River diversion project intake tower of communicating tunnel arcgate bracket beam reinforced concrete calculation of reinforcement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部