叶巴滩水电站截流规划设计

Planing and Design of River Closure in Yebatan Hydropower Station
下载PDF
导出
摘要 叶巴滩水电站位于金沙江干流上游,系金沙江上游13个梯级水电站的第7级。电站采用坝式开发,双曲拱坝,最大坝高217.0m,电站总装机容量为2285MW。在研究了截流时段、截流标准、截流方式、截流方案及截流布置的基础上,分析了河床截流难度,推荐了单戗堤、单向立堵进占得截流规划设计方案。 Yebatan station is located on the upper reaches of the main Jinsha River,the seventh level of13 casecade power stations on the upstream of the Jinsha River,and the power station belongs to dam type development,double curvature arch dam with the maxmum dam height of 217. 0 meters and total installed capacity of power station of 2285 MW. Based on the study on closure time,standard,way,scheme and layout in the paper,by analyzing the difficulty of river-bed closure,the scheme of single berm and one-way closure planning and design is recommoned.
出处 《黑龙江水利科技》 2015年第12期3-6,共4页 Heilongjiang Hydraulic Science and Technology
关键词 截流 截流时段及标准 截流方式 截流方案 规划设计 river closure closure period closure criteria closure mode closure program closure arrangement
  • 相关文献

参考文献2

  • 1中华人民共和国国家发展和改革委员会.DL/T5397-2007水电工程施工组织设计规范[S].北京:中国电力出版社,2007.
  • 2孔科,周顺文.金沙江叶巴滩水电站施工导流专题报告[R].成都:中国电建集团成都勘测设计研究院有限公司,2015.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部