期刊文献+

Distribution Calculation Model of Armored Equipment Maintenance Workload

Distribution Calculation Model of Armored Equipment Maintenance Workload
下载PDF
导出
摘要 The divisions of the typical army maintenance organization's tasks in wartime are discussed.Two distribution models of armored equipment maintenance objects are presented:one is calculated by maintenance workload and the other is calculated by maintenance time.Combined with the division of maintenance time limit for the land force's maintenance institutions,the probability distribution of the maintenance object which is produced from the typical armored equipment's technical failure and battle damage in every repair organization is obtained.A new way for the study of the distribution law of battle damage is supplied,which has an active function to improve the accuracy of technical support program. The divisions of the typical army maintenance organization's tasks in wartime are discussed.Two distribution models of armored equipment maintenance objects are presented:one is calculated by maintenance workload and the other is calculated by maintenance time.Combined with the division of maintenance time limit for the land force's maintenance institutions,the probability distribution of the maintenance object which is produced from the typical armored equipment's technical failure and battle damage in every repair organization is obtained.A new way for the study of the distribution law of battle damage is supplied,which has an active function to improve the accuracy of technical support program.
出处 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期1034-1037,共4页 东华大学学报(英文版)
基金 Military Research Project,China(No.201508)
关键词 repair institutions repair workload distribution model repair institutions repair workload distribution model
  • 相关文献

参考文献3

二级参考文献7

  • 1张玉斌,李波.模糊Bayes方法在聚驱抽油机井可靠性分析中的应用[J].石油工业技术监督,2005,21(10):12-15. 被引量:1
  • 2马绍民,章国栋.综合保障工程.北京:国防工业出版社,1995.
  • 3[5]张金忠.坦克武器修理[M].北京:装甲兵工程学院,1997.
  • 4Wan Yuanxi, HT-7 Team, HT-7U Team. Overview of steady state operation of HT-7 and present status of the EAST project[ J]. Nuclear Fusion ,2000,40 : 1057-1068.
  • 5Bai Hongyu, Bi Yanfang, Wang Jingrong, et al. Design of 2kW/4K helium refrigerator for HT-7U [ C ]. Conference proceedings of ICECI9, 2002.
  • 6(美)[J.O.伯杰]JamesO.Berger著,贾乃光.统计决策论及贝叶斯分析[M]中国统计出版社,1998.
  • 7付豹,朱平,庄明.EAST低温系统又一新降温模式[J].低温与超导,2010,38(3):11-15. 被引量:5

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部