钢铁厂烧结烟气脱硫系统增压风机改造策略研究 被引量:1

Method Research for Transformation of the Booster Fan of Sintering Flne Gas Desulphurization Sytem in Iron & Steel Plant
下载PDF
导出
摘要 对国内最大的红土镍矿烧结生产线中的烟气处理风机的运行状况进行了现场测试分析,梳理了"三机一塔"湿法脱硫工艺中三台主抽风机和一台脱硫增压风机在运行、操作、调节和控制过程中存在的主要问题,即原脱硫系统设计参数小于现场烟气参数。基于此,提出了4种解决问题的工艺方案,进行了对比分析,明确了对主抽风机和脱硫增压风机采用"引增合一"进行改造是解决存在问题的首选方案。 The running condition of the gas draft fans of the largest production-line in laterite nickel has been tested. The main problems in these fans running, operation,production and control show design parameters in the desulphurization system is less than the flue gas parameters in operation. 4 kinds of technological transformation methods are put forward.After studying and comparing these methods, the preferred result is an incorporation of induced draft blower and the booster fan.
出处 《风机技术》 2016年第1期65-71,共7页 Chinese Journal of Turbomachinery
关键词 烧结烟气 引增合一 脱硫 增压风机 主抽风机 性能测试 sintering fuel incorporation of induced draft fan and booster fan desulphurization booster fan main draft fan test performance
  • 相关文献

参考文献9

二级参考文献6

  • 1孙琦明.湿法脱硫工艺吸收塔及塔内件的设计选型[J].中国环保产业,2007(4):18-22. 被引量:10
  • 2工业和信息化部.钢铁行业烧结烟气脱硫实施方案[EB/OL].(2009-07-01)[2009-07-31].http://www.miit.gov.cn/n11293472/n11293832/n11293907/n11368223/12484645.html.
  • 3冯延林.一种湿法烟气脱硫浆液池结晶生成物的控制方法:中国,101518712[P/OL].2009-10-04[2009-10-31].http://ip.com/patapp/CN101518712.
  • 4北京钢院主编.机械零件(下册).北京:人民教育出版社,1980年
  • 5机械工程手册编制委员会.机械工程手册第14卷.北京:机械工业出版社,1982年
  • 6薛俊虎.烧结生产技能知识问卷.北京:冶金工业出版社,2005年

共引文献15

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部