电缆册管理方法及软件应用

Cable List Management Method and Application
下载PDF
导出
摘要 对于海洋工程作业平台而言,其复杂先进的电力及控制系统对电气设计压力巨大,数十万至上百万的电缆信息量,依赖于科学的管理办法是必然趋势。针对如何合理分配人力、物力,提高设计质量,控制建造成本,实现设计、物资、建造等多部门间协调合作等问题,提出一种新的电缆册管理系统并对其实际效果做了简要介绍。 For offshore work platform, its sophisticated and advanced power and control system is enormous pressure on the electrical design, hundreds of thousands to millions of cable information need to be treated. A scientific management method is inevitable. Aiming at the problems of reasonable allocation of human and material resources, enhancing design quality, controlling construction costs, coordination and cooperation between design, materials, construction and so on, a new cable list management system is proposed, the practical effect of the system is described.
作者 王世伟
出处 《船海工程》 北大核心 2015年第B11期98-100,105,共4页 Ship & Ocean Engineering
关键词 海洋工程建造 电缆册设计 互联网平台操作 提高设计效率 控制建造成本 marine engineering construction cable list design internet platform operations improve design efficiency control construction cost
  • 相关文献

参考文献7

  • 1ZainNaboulsi,SaraFord,赵卓,等.高效使用Microsoft Visual Studio[M].北京:机械工业出版社,2012.
  • 2张子阳.NET关键技术深入解析[M].北京:机械工业出版社,2014.
  • 3伍迪.SQLServer2005管理员指南[M].北京:清华大学出版社,2007.
  • 4帕派佐格罗.Web服务[M].北京:机械工业出版社,2010.
  • 5ABS.海上固定平台人级与建造规范[s].ABS,2012.
  • 6DNV.海上固定平台入级与建造规范[S].DNV,2011.
  • 7王荣生.船舶设计实用手册:电气部份/中国船舶工业总公司编[M].北京:国防工业出版社,1997.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部