1000MW机组超低排放改造中厂用电的优化分析 被引量:4

Optimization Analysis on Auxiliary Power for Extra-low Emission Retrofit of 1 000 MW Generating Units
下载PDF
导出
摘要 针对浙能嘉兴发电厂三期2×1 000 MW机组"超低排放环保示范工程"技术改造前后厂用电系统存在的问题,提出了相应的节电优化措施。对改造前后机组厂用电情况进行了比较和分析,为类似机组超低排放改造项目提供借鉴,使超低排放改造不仅满足现代大型火电机组环保的新要求,更能够达到节电降耗的目的。 Aiming at problems in auxiliary power before and after technical innovation of "Environmentalfriendly Pilot Project with Ultra-low Emissions" of 2×1 000 MW power generating units in phase-Ⅲ project of Zheneng Jiaxing Power Plant, the paper presents relevant power saving and optimization measures. The paper also analyzes and compares auxiliary power before and after the innovation and provides experience for extralow emission retrofit of similar power generating units, enabling the ultra-low emission innovation to satisfy the new environmental protection requirement on modern large-scale thermal power generating units and achieve the goal of energy saving and consumption reduction.
作者 翁建明
出处 《浙江电力》 2016年第3期53-56,共4页 Zhejiang Electric Power
关键词 超低排放 厂用电 优化 ultra-low emission auxiliary power optimization
  • 相关文献

参考文献3

二级参考文献6

共引文献5

同被引文献28

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部