摘要
通过对南山水库工程建设条件和影响因素的综合分析,对提出的两个围封水库工程方案分别从坝址、进水形式、供水方式、库容、环境影响及工程投资等方面进行比选,并得出最优方案。
By means of comprehesive analysis on construction conditions and impact factors to build Nanshan Reservoir,the design scheme comparison and selection from two schemes of embankment surrounded reservoir are presented in the paper from some aspects such as dam site,water diversion pattern,water supply way,reservoir capacity,environment impact and project investment,and the optimum design scheme is put forward.
出处
《山西水利科技》
2016年第1期15-17,20,共4页
Shanxi Hydrotechnics
关键词
围封水库
方案
比选
embankment surrounded reservoir
scheme
comparison and selection