山西省中部引黄工程总干线10标~16标施工支洞设计

Construction Adit Design of the Total Trunk from the 10th Bid Section to the 16th Bid Section of the Yellow River Diversion Project in Central Shanxi Province
下载PDF
导出
摘要 山西省中部引黄工程是一项长距离输水工程,包括总干线、东干线、西干线以及各供水支线。10标~16标是总干线3#、4#输水隧洞的一部分,全长81.82 km,采用钻爆法施工,沿线共设27条施工支洞运输出渣。文中叙述了施工支洞设计的总原则,施工支洞洞线的布置,支洞底坡的安排,洞脸的设计,支洞与主洞的连接方式,出渣方法及断面和衬砌的设计等。 The Yellow River Diversion Project in Central Shanxi Province is a long distance water conveyance project including the total trunk,the east and west trunk and several regional water supply branches. The construction adit sections from the 10 th bid section to the 16 th bid section belong to the No.3 and No.4 water conveyance tunnels,which total length is 81.82 km,being constructed by the drilling and blasting method,and 27 construction adits along the total line are set up to transport the rock fragment. The paper narrates the general principle of designing these adits,the layout of their tunnle lines,the design of adit inlet,the arrange of adit bottom slope,the connect pattern of the adit with the main tunnel,the spoiling method,the cross section and lining design,etc.
作者 崔磊
出处 《山西水利科技》 2016年第1期21-23,26,共4页 Shanxi Hydrotechnics
关键词 中部引黄工程 施工支洞 设计 The Yellow River Diversion Project in Central construction adit design
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部