土压平衡盾构机穿越高强度硬岩的施工措施

Construction Measures for Earth Pressure Balance Shield Machine to Tunnel through the High-Intensitive Hard Rock
下载PDF
导出
摘要 文中以南京地铁三号线采用盾构机掘进穿越高强硬岩段的施工为例,系统地介绍了在硬岩施工中对刀具的保护管理措施,得出了盾构机在硬岩地层中掘进时的掘进模式、掘进参数应根据掌子面观察的情况来合理确定以对刀具进行有效保护,同时也论述了渣土改良措施。 Construction of the Nanjing metro line 3 which adopted the earth pressure balance shield machine to tunnel through the high-intensitive hard rock section was taken as an example to systematically introduce the cutter protection measures during the construction in hard rock. The analysis results show that the tunneling mode and parameters should be reasonably determined according to the situation of the working face,so as to protect the cutter effectively. Residue soil improvement measures were also presented in this paper.
作者 张志英
出处 《山西水利科技》 2016年第1期66-68,共3页 Shanxi Hydrotechnics
关键词 土压平衡盾构机 高强硬岩 刀具 措施 earth pressure balance shield machine high-intensitive hard rock cutter measures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部