生物质发电项目装机方案选择 被引量:1

Scheme Selection of Biomass Power Generation Project
下载PDF
导出
摘要 目前生物质发电作为清洁高效的绿色环保项目,在全世界范围内都在大力推广发展和扶持。根据燃料情况、电负荷和热负荷情况,选择最合适的装机方案是最重要的环节。以山东电力工程咨询院有限公司设计的喀麦隆SUDCAM生物质发电工程为例,根据该项目的电负荷、供热负荷需求,通过不同装机方案的技术、经济比选,得出最适合本项目的装机方案,以期为相关工作者提供借鉴。 At present biomass power generation as a clean, green environmenta! protection project, within the scope of the world is in promoting development and support. According to the fuel, electrical load and the heat load , choosing the most appropriate installed programs is the most important link. Taking the Cameroon SUDCAM biomass power generation project designed by Shandong Electric Power Engineering Consulting Institute Co., Ltd. as an example, and according to the demand of electrical load and heating load, and through the technical and economic comparison and selection of different schemes, the most suitable installed program for this project can be drawn in order to provide references for the related workers.
作者 罗勇
出处 《价值工程》 2016年第11期229-232,共4页 Value Engineering
关键词 标煤 标煤耗 年利用小时数 standard coal standard coal consumption annual utilization hours
  • 相关文献

参考文献3

二级参考文献2

共引文献5

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部