摘要
本文以砬子沟电站改造工程为例,详细介绍了电站装机容量及机组机型选择过程。通过对三种初选方案技术参数、电站运行效率和经济性的分析,最终确定了科学合理的组合方案,为工程建设项目合理投资提供了技术支撑。
In the paper,Lazigou Power Station Modification Project is adopted as an example. The selection process of unit model and installed capacity of power station are introduced in detail. The scientific and rational combination plan is finally determined accroding to analyzing the technical parameters,power station operation efficiency and economic of three initially plans,thereby providing technical support for the rational investment of engineering construction project.
出处
《中国水能及电气化》
2016年第3期46-48,共3页
China Water Power & Electrification
关键词
砬子沟电站
装机容量
机型
选择
Lazigou Power Station
installed capacity
model
selection