山岭隧道洞口段桥隧相接工程技术研究 被引量:10

Research on Engineering Technology of Tunnel Immediately Adjacent to Bridge at Mountain Tunnel Entrance
下载PDF
导出
摘要 公路桥隧相接的结合型式采用桥梁伸入隧道设计方案,通过设置枕梁和增大明洞净空高度的措施确保结构稳定,减少隧道洞口大开挖,避免洞口边仰坡失稳滑塌、生态环境破坏;对于桥梁桥台与隧道洞门距离较近路段采用短路基相接,并采用填石路堤结合路基冲刷防护保证短路基稳定安全,通过施工技术控制确保施工质量,对山区公路设计和施工具有借鉴作用。 The design scheme for bridge stretching into tunnel is adopted for binding pattern of tunnel immediately adjacent to highway bridge. The stability of structure is guaranteed through taking measures for setting up bridge and increasing open- cut tunnel clear height,so as to reduce heavy excavation of tunnel entrance,and avoid instable collapse of side upward slope around tunnel entrance and destruction of ecological balance. Short subgrade connecting is adopted for the section of bridge abutment near tunnel entrance,and rock- fill embankment with subgrade scour protection is adopted,so as to guarantee the stability and safety of short subgrade. The construction quality is guaranteed through construction technology control,thus providing reference for mountain highway design and construction.
作者 王晓宇
出处 《北方交通》 2016年第3期130-132,138,共4页 Northern Communications
关键词 山区公路 隧道明洞 桥隧相接 短路基 施工控制 Mountain highway Open-cut tunnel Tunnel immediately adjacent to bridge Short subgrade Construction control
  • 相关文献

参考文献5

二级参考文献13

共引文献43

同被引文献54

引证文献10

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部