以设计为龙头的工程总承包建设模式具有优化工艺工序、节约工期成本、促进设计创优和技术创新等优势。分析了以设计为龙头的总承包商在项目管理过程中实施设计优化的关键点、可能遇到的风险和制约因素,并有针对性地提出了设计优化的风险管控策略。
Engineering as a leading function of EPC management appears plenty of advantages,such as process optimization,time and cost reduction,better design quality,technological innovation,etc. In order to promote the EPC project management for design institute,the paper analyses key points and risks and constrains of engineering optimization,and risk control strategies are put forward purposely.
出处
《南方能源建设》
2016年第1期76-79,共4页
Southern Energy Construction