摘要
全寿命周期成本管理在电网规划阶段的应用是电网企业管理体系中极为重要的一环。依据全寿命周期成本管理理论,以设备的寿命周期为规划研究周期,提出了基于资产全寿命周期成本的输电网规划方案比选方法。通过分析规划方案全寿命周期成本的构成,提出了涵盖全过程、计及规划阶段成本颗粒度的分析模型,并运用该方法对浙江500 k V目标网架规划方案进行了比选。仿真结果表明,所提出的方法可以提高电网规划的科学性,实现电网资产全寿命周期各环节工作的协调与统一。
The application of life cycle cost( LCC) management in network planning is an important part of the management system in a power company. According to the LCC management theory,with taking the life cycle of equipment as planning research period,this presents a LCC-based method for comparing multiple network planning schemes in transmission network planning. Through the analysis on the LCC composition of planning scheme,this paper suggests a whole process analysis model in viewof costs in different network planning stages. The proposed method is applied in the planning scheme selection of the 500 kV long-range network planning in Zhejiang. The simulation results showthat this method can improve the scientific nature of power grid planning and implement the coordination and unification of each stage in the LCC process of power grid.
出处
《电力建设》
北大核心
2016年第4期43-49,共7页
Electric Power Construction
基金
国网浙江省电力公司科技项目(5211JY150008)