5Oyler D C, Frith R C, Dolinar D R, et al. International experience with longwall mining into pre-drivcen rooms [A]. Proceedings of the 17th International Conference on Ground Control in Mining[C]. Morgantown : WV Univ. , 1998:44-52.
6Tadolini S C, Zhang Y, Peng S. Pre-driven experimental longwall re- covery room under weak roof conditions-design, implementation, and evaluation[ A ]. Proceedings of 21st International Conference on Ground Control in Mining[C]. Morgantown,2002 : 1 - 10.
7Wichlacz D. Development of a pre-driven recovery evaluation pro- gram for longwall operations [ A -. Coal 2009 : Coal Operators' Conference[ C ]. University of Wollongong & the Australasian institute of Mining and Metallurgy ,2009:23-36.
8Mark C. The state-of-the-art in coal pillar design [ A]. SME Pre- print 99-86 [C]. Litdeton : Society for Mining, Metallurgy, and Ex- ploration, Inc. , 1999 : 1-8.