5T. Alhazmi, R. McCaffer. Project Procurement SystemSelection ModelfJ]. J Constr Eng . Manage,2000 :176-184.
6Mark Konchar, Victor Sanvido. Comparison of U. S.Project delivery systems[J]. J Constr Eng Manage,1998 :435-444.
7James W . Rosner,Alfred E. Thai Jr, ChristopherJ. West. Analysis of the Design-Build Delivery Method inAir Force Construction Projects [J]. J Constr Eng Manage,2009: 710-717.
8Tiina Koppinen, Pertti Lahdenpera. Realized EconomicEfficiency of Road Project Delivery Systems. J. Infrastruct[J]. Syst, 2007: 321-329.
9Darren R. Hale, P. E.,Pramen P. Shrestha, P. E.,et al . Empirical Comparison of Design/Build andDesign/Bid/Build Project Delivery Methods [J]. J ConstrEng Manage, 2009( 7 ): 579-587.
10Peter E. D . Love. Influence of Project Type andProcurement Method on Rework Costs in BuildingConstruction Projects[J]. J Constr Eng Manage,2002.128:18-29.