结合前期线路的经历,借鉴其他先建城市的经验,对机电系统安装调试工作从系统特点、工期安排和人员管理等三方面分析和总结,为后续城市机电系统建设管理者提供借鉴。
Combined with experience in previous stage and learning from the experience of other cities, the installation and commissioning of electric-mechanical systems is analyzed and summa- rized in terms of system features, project time limit and personnel management, providing refer- ence for the installation and commissioning of the electromechanical system of later urban rail transit.