期刊文献+

爆破拆除楼房时塌落振动的预测 被引量:3

Prediction of collapse vibration of building demolished by blasting
下载PDF
导出
摘要 从十余栋楼房塌落振动综合实测中可见,峰值振速总是由楼房倒塌触地的姿态所决定,即可能发生在后支撑爆破楼房下坐、切口闭合或翻倒触地时,且峰值也不尽相同。由此,在量纲分析中引入重心下落高度,分别建立了楼房下坐、楼房切口闭合冲击和建(构)筑物整体翻倒触地振动的峰值振速经验公式,阐述了相应的楼房、建(构)筑物不同塌落振动原理,并从案例实测振速对数图峰值最大包络线中,摄取公式待定参数Kt、β,由此分别提出对应的峰值振速算法的计算公式,并阐明参数的物理意义和取值。预测地点振速可先按结构选取,高大烟囱、现浇剪力墙(包括前跨现浇剪力墙的框剪结构及13层以上的单向倾倒现浇框剪结构的前方预测点)的塌落峰值振速,选取算法(3)计算峰值振速。框架和其他框剪楼房塌落振动的峰值,可按触地姿态选取算法(1)和算法(2)计算,并选取算法中的较大计算值为预测的峰值振速。由于补充了算法(1)和算法(2),综合算法正确地反映了形成峰值振速的楼房触地位置和撞地冲击时重心改变的高度,因此振动原理较明确,由此提高了预测塌落振动的针对性和准确性。并结合观测实例进行了公式验证,证明了公式的合理性。 More than ten buildings collapse vibration were comprehensively measured,and peak vibration velocity was always determined by building collapse touchdown attitude,it′s likely to occur in rear support sitting down by blasting,incision closure or toppling on ground,and the peak values were not same.Therefore,falling height of the center of gravity was introduced in dimensional analysis,the empirical formula of the peak value of vibration speed of buildings sitting down,incision closure shock and building(structure)overturned wholly on ground were respectively established.Different collapse vibration principle were correspondently described.Formula parameters Ktandβwere taken out from the peak envelope line of case in measured velocity logarithmic graph.Formulas respectively corresponding to peak velocity algorithms were proposed,and physical meaning of parameters and values were explained.According to the structure selected,high chimneys,cast-in-place shear wall(including the former cross cast-in-place shear wall ahead of frame and front site of cast-in-situ frame shear wall structure more than 13storeys),prediction collapse vibration peak velocity was calculated by algorithm(3).Frame and other shear wall frame buildings collapse vibration peak was calculated by touchdown attitude to select algorithm(1)and(2),the vibration velocity greater was selected for the prediction vibration value.Algorithm(1)and(2)were supplemented,integrated new algorithm correctly reflected touchdown position of formation of vibration wave peak of building and the changed height of the center of gravity of impact hit on ground,so the principle of vibration was more explicit and the pertinence and accuracy of collapse vibration predicted would be improved.The observed examples were listed and the rationality of the formulars were proved.
作者 魏晓林 刘翼
出处 《工程爆破》 2016年第2期13-18,共6页 Engineering Blasting
关键词 高大建筑物 爆破拆除 触地姿态 塌落振动 峰值振速 High and larger building Blasting demolition Touchdown posture Collapse vibration Peak vibration velocity
  • 相关文献

参考文献3

二级参考文献29

  • 1刘满堂,陈庆寿.建筑结构对爆破地震的动力响应特性研究[J].爆破,2005,22(4):23-28. 被引量:23
  • 2蔡路军,马建军,江兵,虞珏,章启忠.考虑振动频率的爆破振动安全标准的探讨[J].黄金,2006,27(3):24-27. 被引量:13
  • 3崔晓荣,沈兆武,周听清,傅建秋.剪力墙结构原地坍塌爆破分析[J].工程爆破,2006,12(2):52-55. 被引量:15
  • 4亨利奇J.爆炸动力学及其应用[M].北京:科学出版社,1987..
  • 5于亚伦.工程爆破理论与技术[M].北京:冶金工业出版社,2007:335-337.
  • 6GUO Yue-liang, ZUO Yu-jun,WANG Di-an. Discussion on Collapse Vibration Caused by Demolition Blasting [A]. New Development on Engineering Blasting APS Blasting 1[M], 2007 Kunming China. Beijing:Metallurgical Industry Press,2007.
  • 7周家汉,陈善良,杨业敏,戴铭荣.爆破拆除建筑物时振动安全距离的确定[A]:工程爆破文集(第三辑)[C].北京:冶金工业出版社,1988,112-119.
  • 8周家汉,金保堂,陈善良.高烟囱拆除爆破及塌落振动测量与分析[A].工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001,707-712.
  • 9于亚伦.工程爆破理论与技术[M](全国工程爆破作业人员统一培训教材).北京:冶金工业出版社,2004,323-358.
  • 10曲广建,崔允武,吴岩,等.温州市93m结构不对称楼房拆除爆破[A].中国典型爆破工程与技术[M].北京:冶金工业出版社,2006.

共引文献236

同被引文献26

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部