大跨度多塔斜拉桥边跨落架研究

Research of removing temporary supports of sidespan of multi pylon cable-stayed bridge with long span
下载PDF
导出
摘要 嘉绍跨江大桥主航道桥全长2 680 m,北岸边跨70 m支架梁段采用部分落架方式来实现顶推合龙。由于落架对主梁受力产生不利影响,因此需对该部分落架方案进行调整,以减小合龙口两端高差。利用NLABS有限元软件,采用反力调整方案,对调整前后进行对比分析,并用强制位移方案进行校核,得出最终落架控制条件。 The length of main channel bridge of Jiaxing-Shaoxing River-Crossing Bridge is 2 680 m,the segament of sidespan which is70 m in north shore was pushed closure by removing part of temporary supports. Because of the bad effects to the girder by removing the temporary supports,it should be adjusted the project of it,which can reduce the difference of elevation of the closure. Using the finite element software of NLABS,the project of adjusting the force of supports was adopted. The final dominating condition was obtained by analyzing the results of the former and the latter,and results were checked by using the project of forcing displacement.
出处 《四川建筑科学研究》 北大核心 2016年第2期16-18,共3页 Sichuan Building Science
基金 交通运输部科技项目(2010-353-333-130)
关键词 嘉绍跨江大桥 控制条件 六塔斜拉 Jiaxing-Shaoxing River-Crossing Bridge dominating condition six-tower cable-stayed bridge
  • 相关文献

参考文献6

二级参考文献22

  • 1翟世鸿,张照霞.国内超大跨度钢斜拉桥上部结构施工控制探讨[J].中外公路,2006,26(1):108-112. 被引量:9
  • 2吴运宏,黄晓航.重庆李渡长江大桥斜拉桥施工监控计算[J].桥梁建设,2006,36(A02):180-182. 被引量:15
  • 3Virloguex M. Design of the Normandie Bridge. Proceedings of the International Conference on Cable - Stayed and Suspension Bridge [J]. IABSE,1994,(1) :23 -26
  • 4Hirahara N. Erection of Superstructure of Tatra Bridge (Report Ⅰ) -Tower Erection and Large Block Erection of Deck at Tower[ R ]. Honshi Technical Report, 1997,21 (5) : 15 - 20
  • 5Virlogeux M. Recent evolution of cable-stayed bridges [ J ]. Engineering Structures, 1999, 21 : 737-755.
  • 6Fujisawa N, Tomo H. Computer-aided cable adjustment of stayed bridges [ C ]//IABSE. 1985 : 181-190.
  • 7Breen J E. Controlling twist in precast segment concrete bridge[J]. PCI Journal, 1985, 4.
  • 8Furukawa K, Inoue K, Nakayama H, et al. Studies of the management of cable-stayed bridges under construction using multiobjective programming method [ C ]//Proceedings of Japanese Society of Civil Engineering. Japan : 1986 : 1-6.
  • 9Sakai F, et al. Construction control system for cable-stayed bridges[C]//Proe. IABSE. 1988, 92(85) : 147-152.
  • 10Sakai F, et al. Application of construction control system to erection of stiffening truss girder of Rainbow Bridge [ C ]// Proc. Inter. Conf. Bridge into 21 Century. Hong Kong: 1994 : 459-466.

共引文献230

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部