期刊文献+

大采高综采面推进速度与周期来压步距关系分析 被引量:2

Analysis of Relationships between Propulsion Velocity and Periodic Weighting Length at Fully-mechanized Mining Face with Large Mining Height
下载PDF
导出
摘要 以察哈素煤矿首采工作面为工程背景,通过对工作面支架工作阻力监测以及推进数据的收集、整理和分析,对大采高综采超长工作面推进速度与周期来压步距间的关系进行了深入细致的研究,得到了周期来压步距与推进速度的函数关系式。 The initial mining face of Chahashu mine is taken as an engineering background, the working resistance of support at working face is monitored, and propulsion data is collected,reorganized and analyzed. Then meticulously studies the relationships between propulsion velocity and periodic weighting length at ultra-long fully-mechanized mining face with large mining height, and finally gets the functional relation formula between periodic weighting length and propulsion velocity.
出处 《煤炭技术》 CAS 北大核心 2016年第4期24-26,共3页 Coal Technology
关键词 推进速度 周期来压步距 持续步距 支架工作阻力 propulsion velocity periodic weighting length sustained length working resistance of support
  • 相关文献

参考文献4

二级参考文献19

共引文献180

同被引文献15

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部