期刊文献+

工期约束下的电网工程建设项目计划制定与控制研究

Research on Planning and Control of Power Grid Project Construction Project Under the Constraint of Time Limit
下载PDF
导出
摘要 针对电网工程建设项目计划制定和控制问题,讨论了在工期有限制条件下,力求资源均衡地消耗问题.在传统资源均衡优化方法的基础上,提出了合理使用细菌觅食算法解决资源均衡优化问题的方法,并设计了相应的算法过程.实例模拟计算表明,利用细菌觅食算法可求得均衡性更优化的施工过程. For power grid construction project plan formulation and control problem,the paper discusses the in-timelimit for a project with constraints,and strives to resources balanced consumption problem. On the basis of the tradi-tional resource leveling optimization method,the paper puts forward the reasonable using bacterial foraging algorithmsolving the resource balance optimization problems,and designs the corresponding algorithm process,and examples ofsimulation calculation show that bacterial foraging algorithm can be used to calculate the equilibrium optimization con-struction process.
作者 李阿勇
出处 《南京师范大学学报(工程技术版)》 CAS 2016年第1期89-92,共4页 Journal of Nanjing Normal University(Engineering and Technology Edition)
关键词 项目需求计划 电网工程项目 细菌觅食算法 project demand plan power grid project BFOA
  • 相关文献

参考文献6

  • 1ANDERSEN H B,GARDE H,ANDERSEN V. MMS:an electronic message management system for emergency response[J].IEEE transactions on engineering management,1998,45(2):132-140.
  • 2MENG X,SUN M,JONES M. Maturity model for supply chain relationships in construction[J].Journal of management in engineering,2011,27(2):97-105.
  • 3FREELAND J R,MOORE J H. Implications of resource directive allocation models for organizational design[J].Management science,1977,23(10):1 050-1 059.
  • 4LEU S,CHEN A,YANG C. A GA-based fuzzy optimal model for construction time-cost trade-off[J].International journal of project management,2001,19(1):47-58.
  • 5LEU Y,RAKES T R,REES L P,et al. Modelling resource allocation in a decentralized organization with an AI-based,goal-directive model[J].Decision sciences,1992,23(5):1 027-1 049.
  • 6SEARS C. 建筑项目管理[M].北京:机械工业出版社,2004.

相关作者