期刊文献+

关于土石坝渗流监测相关问题的探讨 被引量:2

Discussion on related problems about seepage monitoring of earth-rock dam
下载PDF
导出
摘要 针对大坝渗流监测工作中测压管与渗压计选择,渗流压力与浸润线的关系,测压管制作埋设,土石坝渗流项目监测布置的规范性和有效性,大坝安全监测分析管理软件,大坝监测技术人员能力建设等方面的问题进行了分析探讨,并结合实际工作经验,提出了部分系统存在的设计缺陷,可对大坝安全监测系统设计和运行管理工作提供参考。 Several problems are analyzed and discussed in this paper,such as:selection of piezometric tube and osmotic pressure gauge during dam seepage monitoring,relationship of seepage pressure and seepage line,making and burying method of piezometric tube,standardization and effectiveness of earth-rock dam seepage project monitoring layout,analysis and management software of dam safety monitoring,technical staff ability construction of dam monitoring. Combining with practical work experience,a part of system design flaws is proposed. References for design and operation management of dam safety monitoring system are provided.
作者 高志勤
出处 《江苏水利》 2016年第3期23-25,共3页 Jiangsu Water Resources
关键词 土石坝 渗流 监测 设计 earth-rock dam seepage monitor design
  • 相关文献

同被引文献15

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部