摘要
介绍了某电厂#6机组四大管道支吊架的运行状态及故障缺陷,利用CAESARⅡ软件对四大管道进行了管系应力校核。根据应力计算及现场检查结果,提出了科学合理的调整方案并进行了调整处理,对支吊架运行监督提出了建议。
This paper introduced the operation state and its fault condition of supports and hangers in the four primary pipelines for a certain No. 6 power unit,and made a piping stress check for the four primary pipelines using CAESAR Ⅱ software. According to the results of stress calculation and on-site inspection,this paper proposed a scientific and reasonable adjustment scheme and put it into practice. After that,some suggestions were put forward for the operation supervision of supports and hangers.
出处
《华电技术》
CAS
2016年第2期31-34,78,共4页
HUADIAN TECHNOLOGY