基于NNIA的工程项目工期-成本-质量综合优化

Analysis of Time- cost- quality Trade- off Optimization In Engineering Project Based on Non- dominated Neighbor Immune Algorithm
下载PDF
导出
摘要 工期、成本、质量是工程建设项目的三大控制目标。当前工程管理人员对三大目标的控制相对独立,不能高效地对三大目标进行综合控制。为了更好地解决三大目标之间的协调问题,结合系统可靠性原理,利用二元决策图(Binary Decision Diagram,BDD)对工程项目的整体质量水平进行评价。同时,考虑工程实际的奖罚制度,构建工期-成本-质量综合优化模型并运用非支配近邻免疫算法(Non-dominated Neighbor Immune Algorithm,NNIA)进行求解。运算结果得到了一系列Pareto最优解,验证了所构建模型的可行性及NNIA对求解该模型的有效性。 Project duration,cost and quality are three main objectives of engineering projects. The current controls of the three aspects are relatively independent,which produce the effect in practice is limited. In order to address the issue of coordination among the three objectives better and provide effective decision support for managers,a time- cost- quality trade- off model has been built. In addition the Non- dominated Neighbor Immune Algorithm( NNIA) has been used to solve the model. The computational result obtained a series of Pareto optimal solution,verifying the feasibility of the model and the effectiveness of NNIA to solve the model.
作者 金成
出处 《福建建筑》 2016年第3期84-88,共5页 Fujian Architecture & Construction
关键词 工程项目 工期-成本-质量综合优化 质量可靠性 非支配近邻免疫算法(NNIA) 二元决策图(BDD) Engineering project Time-Cost-Quality trade-off Quality reliability Non-dominated neighbor immune algorithm Binary decision diagram
  • 相关文献

参考文献13

  • 1Babu A J G,Suresh N.Project management with time,cost,and quality considerations[J].European Journal of Operational Research,1996,88(2):320-327.
  • 2El-Rayes K,Kandil A.Time-cost-quality trade-off analysis for highway construction[J].Journal of Construction Engineering and Management,2005,131(4):477-486.
  • 3Pollack-Johnson B,Liberatore M J.Incorporating quality considerations into project time/cost tradeoff analysis and decision making[J].IEEE Transactions on Engineering Management,2006,53(4):534-542.
  • 4张连营,岳岩.工期—成本—质量的模糊均衡优化及其Pareto解[J].同济大学学报(自然科学版),2013,41(2):303-308. 被引量:19
  • 5王健,刘尔烈,骆刚.工程项目管理中工期—成本—质量综合均衡优化[J].系统工程学报,2004,19(2):148-153. 被引量:163
  • 6杨耀红,汪应洛,王能民.工程项目工期成本质量模糊均衡优化研究[J].系统工程理论与实践,2006,26(7):112-117. 被引量:55
  • 7Ghodsi R,Skandari M R,Allahverdiloo M,et al.A new practical model to trade-off time,cost,and quality of a project[J].Australian Journal of Basic and Applied Sciences,2009,3(4):3741-3756.
  • 8Afshar A,Kaveh A,Shoghli O R.Multi-objective optimization of time-cost-quality using multi-colony ant algorithm[J].Asian Journal of Civil Engineering(Building and Housing),2007,8(2):113-124.
  • 9Rahimi M,Iranmanesh H.Multi objective particle swarm optimization for a discrete time,cost and quality trade-off problem[J].World Applied Sciences Journal.2008,4(2):270-276.
  • 10刘吉成,常昊,王素花.基于Pareto蚁群算法的风电项目工期-成本-质量均衡优化[J].电力建设,2014,35(4):127-131. 被引量:3

二级参考文献42

共引文献222

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部