摘要
浙江富阳市万市镇十字街位于岩溶塌陷区内,周围环境要求高。经过地质调查、地基稳定性分析和治理方案比选,采用高压喷射注浆法对岩溶塌陷路基进行治理,取得了良好效果。
Cross street wan-shi town,Fuyang City is located on the karst subsidence area,the environment demand is high.After geological survey,foundation stability analysis and Treatment plan optimization,By the method of high-pressure jet grouting,Good governance effect is obtained.
出处
《地质灾害与环境保护》
2016年第1期32-36,共5页
Journal of Geological Hazards and Environment Preservation